TORONTO, ON / ACCESSWIRE / October 17, 2022 / Amaroq Minerals Ltd. (AIM, TSXV:AMRQ – formerly AEX Gold), an independent mine development company with a substantial land package of gold and strategic mineral assets covering an area of 7,866.85 km2 in Southern Greenland, announces that the updated National Instrument 43-101 report pertaining to the Nalunaq project, has been filed on the Company’s SEDAR profile (www.sedar.com).

The Technical report details the updated Mineral Resource Estimate (MRE) for its flagship Nalunaq Gold project, prepared by SRK Consulting (UK) Limited (SRK). This update, termed MRE3, was announced on September 6, 2022 and is reported in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards on Mineral Resources and Mineral Reserves (May 2014).

The updated MRE is summarised in Table 1 below.

Highlights

Total Inferred Mineral Resource of 355.0Kt @ 28.0g/t Au for 320Koz gold, reported according to CIM Definition Standards by SRK.This constitutes a 30% increase in contained gold compared to the previous estimate reported in June 2020 and a 50% increase in average grade.The Nalunaq project now sits within the top 2% in terms of global reported gold resource grades.Due to the high grade nature of the Nalunaq deposit, it is relatively insensitive to cut-off grade and remains robust at a range of gold prices.

Table 1: Mineral Resource Statement for Nalunaq gold deposit, Greenland, as of 3rd September 2022

Mineral Resource

Gross

Net attributable

Operator

Tonnes (t)

Grade (g/t Au)

Contained Metal (Oz)

Tonnes (t)

Grade (g/t Au)

Contained Metal (Oz)

In-Mine Inferred

140,000

31.0

140,000

140,000

31.0

140,000

Amaroq Minerals

Extension Inferred

215,000

26.0

180,000

215,000

26.0

180,000

Amaroq Minerals

TOTAL

355,000

28.0

320,000

355,000

28.0

320,000

Amaroq Minerals

Mineral Resource Statement Notes

Mineral Resources are reported in accordance with the CIM Definition Standards.Mineral Resources have an effective date of 3 September 2022, and have been depleted to reflect the current understanding of the mining completed up to the date of production ceasing in 2013;Mineral Resources are reported as in-situ and undiluted. The Mineral Resources are reported above a cut-off grade of 5.0 g/t, generated using a gold price of 1,800 USD/ozAu. Given these parameters, SRK considers there to be reasonable prospects for eventual economic extraction, and as such, fulfil the requirements for reporting a Mineral Resource;The In-Mine Mineral Resource is accessible from existing underground development while the Extension Mineral Resource requires development to be put in place for it to be accessed;Mineral Resources are not Ore Reserves and have not demonstrated economic viability, nor have any mining modifying factors been applied;The Competent Person for the declaration of Mineral Resources is Dr Lucy Roberts, MAusIMM(CP), of SRK Consulting. The Mineral Resource estimates and accompanying Statements were produced and reviewed by a team of consultants from SRK.SRK notes that a site visit to Nalunaq was conducted by the QP in September 2021;Tonnages are reported in metric units, with metal grades in grammes per tonne (g/t). Tonnages and grades are rounded. Rounding, as required by reporting guidelines, may result in apparent summation differences between tonnes, grade and contained metal content. Where these occur, SRK does not consider these to be material.

Qualified Person Statement

The Mineral Resource Estimate was prepared by Dr Lucy Roberts, MAusIMM(CP), Principal Consultant (Resource Geology), SRK Consulting (UK) Limited., an independent Qualified Person in accordance with the requirements of National Instrument 43-101 (“NI 43-101”). Dr Roberts has approved the disclosure herein.

The technical information presented in this press release has been approved by James Gilbertson CGeol, VP Exploration for Amaroq Minerals and a Chartered Geologist with the Geological Society of London, and as such a Qualified Person as defined by NI 43-101.

Use of a Standard

The resource information included within this announcement is reported in accordance with the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Definition Standards on Mineral Resources and Mineral Reserves (May 2014) as required by CIM Definition Standards.

Enquiries:

Amaroq Minerals Ltd.
Eldur Olafsson, Executive Director and CEO
+354 665 2003
[email protected]

Eddie Wyvill, Investor Relations
+44 (0)7713 126727
[email protected]

Stifel Nicolaus Europe Limited (Nominated Adviser and Broker)

Callum Stewart
Simon Mensley
Ashton Clanfield
+44 (0) 20 7710 7600

Panmure Gordon (UK) Limited (Joint Broker)

John Prior
Hugh Rich
Dougie Mcleod
+44 (0) 20 7886 2500

SI Capital Limited (Joint Broker)

Nick Emerson
Charlie Stephenson
+44 (0) 1483 413500

Camarco (Financial PR)

Billy Clegg
Elfie Kent
Charlie Dingwall
+44 (0) 20 3757 4980

For Company updates:

Follow @Amaroq_minerals on Twitter
Follow Amaroq Minerals Inc. on LinkedIn

Further Information:

About Amaroq Minerals

Amaroq Minerals’ principal business objectives are the identification, acquisition, exploration, and development of gold and strategic metal properties in Greenland. The Company’s principal asset is a 100% interest in the Nalunaq Project, an advanced exploration stage property with an exploitation license including the previously operating Nalunaq gold mine. The Corporation has a portfolio of gold and strategic metal assets covering 7,866.85km2, the largest mineral portfolio in Southern Greenland covering the two known gold belts in the region. Amaroq Minerals is incorporated under the Canada Business Corporations Act and wholly owns Nalunaq A/S, incorporated under the Greenland Public Companies Act.

Forward-Looking Information

This press release contains forward-looking information within the meaning of applicable securities legislation, which reflects the Company’s current expectations regarding future events and the future growth of the Company’s business. In this press release there is forward-looking information based on a number of assumptions and subject to a number of risks and uncertainties, many of which are beyond the Company’s control, that could cause actual results and events to differ materially from those that are disclosed in or implied by such forward-looking information. Such risks and uncertainties include but are not limited to the factors discussed under “Risk Factors” in the Final Prospectus available under the Company’s profile on SEDAR at www.sedar.com. Any forward-looking information included in this press release is based only on information currently available to the Company and speaks only as of the date on which it is made. Except as required by applicable securities laws, the Company assumes no obligation to update or revise any forward-looking information to reflect new circumstances or events. No securities regulatory authority has either approved or disapproved of the contents of this press release. Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Glossary

Au

gold

g

grams

g/t

grams per tonne

km

kilometers

Koz

thousand ounces

m

meters

MRE2

Mineral Resource Estimate 2020

MRE3

Mineral Resource Estimate 2022

oz

ounces

t

tonnes

t/m3

tonne per cubic meter

USD/ozAu

US Dollar per ounce of gold

Inside Information

This announcement does not contain inside information.

SOURCE: Amaroq Minerals Ltd.

View source version on accesswire.com:
https://www.accesswire.com/720627/Updated-Nalunaq-NI-43-101-Technical-Report-Filed-on-SEDAR